Job site | Job description | Date |
|---|---|---|
PORTUGAL | – Wood yard equipments erection
– handling and storage chip plant. | September 2010 February 2011
|
PORTUGAL
| – Evaporation expansion
Several piping works – manufacture + erection
Surface condenser erection
Foul condensate tank modification | Nov. Dec. 2011
Jan. Feb, 2012 |
SPAIN
| – Boiler economizer replacement and repair – Recovery boiler super heater repair | April/May 2012 |
SOUTH AFRICA
| – Paper pulp Dryer erection at SAPPI NGODWANA
| October 2012
April 2013 |
FRANCE | – Bleaching tower, D1 shell repair on bottom part
– Wood receiving chain conveyor manufacture and erection | September/October 2013
|
PORTUGAL
| – Increase production capacity Several piping works;
Pulp machine upgrade and maintenance
– Wet zone, dryer, cutting zone and bailing line | Nov. Dec. 2013
Jan. Feb. 2014 |
PORTUGAL | – Piping Refurbishing from the thermal power plant
– Piping refurbishing from the mil water supply system | May to Oct. 2014
|
FRANCE
| – Wood – yard shut down maintenance repair works
– Evaporator effect repair | April 2015
|
FRANCE | – Wood – yard shut down maintenance repair works
– Piping and mechanical works at DD washer | October 2016
|